from

+4.2%

production increase

FIELD RESULTS

Nitric acid plants
direct DCS operation.

Software that autonomously optimizes and operates all 20+ DCS set points from inlet ammonia flow rate to NOx emissions.

Liquid ammonia evaporation  

Compressor train  

Converter  

Heat utilization  

Absorption  

NOx abatement  

Steam network  

Cooling water distribution

7 plants, no two alike.

Even the plants already pushing above design capacity gained more.

Years Built

1970s – 2010s

Capacity

300 – 950 TPD

Design capacity utilization

94 – 103%

Technologies

Mono-high-pressure; mono-medium-pressure; dual-pressure

DCS vendors

Schneider Electric, Honeywell, Yokogawa, Emerson

Production increase in TPD, plant by plant.

Production rate improved without adverse effects on other process parameters, including the NH3 consumption norm.

+62.9

+46.7

+23.7

+16.6

+16.1

+15.4

+14.8

All results are actual plant measurements taken at the acid flow meter on the line to the product tank.

Paths to higher production.

Typical production improvements from AI Software, APC and Capital projects.

PATH

AI process control

Advanced process control

Capital projects

Turbine inlet air chilling installation

Converter basket replacement

Steam turbine upgrade

Air compressor retrofit

PRODUCTION INCREASE

4.2 – 6.3%

0.5 – 2%

3 – 10%

3 – 4%

3 – 5%

4 – 5%

6 – 10%

AVG. ROI, MONTHS

3

9

14 – 36+

14

21

28

36+